Showing posts with label ACEC. Show all posts
Showing posts with label ACEC. Show all posts

Tuesday, November 1, 2011

Ted Williams Joins College of Fellows of ACEC


Ted C. Williams, P.E., FACEC, principal and EVP of LandmarkJCM, has been inducted into the College of Fellows of the American Council of Engineering Companies, an elite group of engineers who have made significant contributions to the engineering profession through their experience, knowledge and networking abilities.

Ted (second from right) was reconized by (from left) David Raymond, President and CEO of ACEC, Everett Cowan, Chairman of the Committee of Fellows, and Terry Neimeyer, Chairman of ACEC, during their Fall Conference held October 19-22, 2011 at Caesar’s Palace in Las Vegas, Nevada. Ted currently serves as ACEC Chairman-Elect and will succeed Terry Neimeyer, who began his one-year term as ACEC Chairman in March, 2011.

ACEC is the voice of America's engineering industry. Council members – numbering more than 5,000 firms representing more than 400,000 employees throughout the country – are engaged in a wide range of engineering works that propel the nation's economy, and enhance and safeguard America's quality of life. The Council's mission is to contribute to America's prosperity and welfare by advancing the business interests of member firms.

Wednesday, March 17, 2010

DelDOT Subdivision Manual Changes

On Tuesday, March 16th, ACEC-Kent County met with Marc Cote of DelDOT to discuss some of the recent changes to the Subdivision Manual. Melissa Koenig, P.E., Associate of Landmark/JCM attended the meeting. The following were some of the changes that were discussed:

• Soon, there will be a GIS application available online.

• When calculating site distance, please use the JMT spreadsheet. When showing the site triangles on a plan, the decision point is 18’ from the edge of travel lane (can range from 14.5’ to 18’, but for the most part use the 18’). The spreadsheet can be found under the subdivision section at http://deldot.gov/information/business/

• The Subdivision Plan Review Schedules online are for Record Plans and Construction Plans. The engineer can attend the Plan Review Meeting if it will be helpful. The schedule for offsite improvements has not been determined yet. The plan review schedule is available online at http://deldot.gov/public.ejs?command=PublicPlanReviewSchedule

• Please note on the Site Plan Gate-Keeping Checklist one of the required items is a photo showing the proposed entrance staked. You will also need to provide calculations showing the minimum connectivity ratio of 1.4 is met. Marc said this will be covered in future training sessions by DelDOT. The Gate-Keeping checklist is available online at http://deldot.gov/information/business/subdivisions/Subdivision_Gatekeeping_Checklist.pdf

• The DelDOT ES2M Checklist should be completed for onsite and offsite submittals. (http://www.deldot.gov/information/pubs_forms/manuals/es2m/index.shtml)

• If the total open area of culvert pipes is > 20 S.F., then it is considered a bridge (see Appendix Q). If there are multiple pipes, all the areas must be added together.

• The Pre-Submittal Meeting (required for ADT>200) can be before or after the PLUS process. (http://deldot.gov/information/business/subdivisions/Subdivisions_Pre-submittal_Meeting_Requirements.pdf)

• Please submit the meeting request form when asking to meet with the subdivision section so that they can be prepared for the meeting. The request form can be found under the subdivision section at http://deldot.gov/information/business/

Wednesday, January 27, 2010

Important Information from New Castle County

Bruce Tease from Landmark/JCM attended a meeting with New Castle County Special Services. ACEC meets with NCC Special Services quarterly to coordinate items of common interest. For more information on the important matters discussed, please contact Bruce at 302-323-9377 x 122

Tuesday, January 12, 2010

New Castle County Land Use Meeting

Bruce Tease, President of Landmark/JCM, attended a meeting between ACEC and NCCLU recently and reported the following:

1. NCC has received 3 plans submitted under the '2 Step Enhanced Review Process'. NCC is working on revised check list to clearly identify what is required for Exploratory submissions and what is required for Record submissions. Some old Preliminary Plan items have been moved up to Exploratory and some have been moved to back to Record. In the interim please read "Appendix 2" in the 2 step process documents to get the Exploratory submission requirements to make a complete submission.


2. NCCLU has agreed to review (with input from ACEC) current code requirements for parking, sidewalks, and landscaping. The current 'green' initiatives will be considered in each case.

3. NCCLU is reviewing current LDIA bonding requirements. Consideration will be given to reducing bonding requirements and possibly providing for phasing similar to DELDOT.

4. NCCLU has been advised by Randy Greer that a digitized version of the New Castle County soils mapping will soon be available. ACEC members will be notified.

5. George Haggerty will look into the 'Site Plan' review process. Evidently the Planning Department is reviewing the initial submission as an Exploratory Plan submission when this should be a one step process.

6. NCCLU is meeting with DNREC to discuss schedule and requirements for implementation of EPA Turbidity requirements for site runoff.

7. NCC has had provided information to DAPE about firms and professional engineers that consistently prepare sub-standard engineering.

8. NCCLU is working on providing the capability to print electronic CCR reports. All CCR reports should be submitted electronically. Paper submissions will be cut off soon.

9. A refined definition for 'non-delineated floodplain' will be issued using a minimum 50 acre threshold.


10. A policy for 'construction shut downs' is near completion. A copy will be issued to ACEC, HBA, and interested parties for review and comment.

11. Revisions to the 'Sign Code', Sewer Ordinance, and BRAC Amendments are all in process at NCC.